SCANA Bypass & Seal Air Duct Addition

This project centered on the addition of the bypass duct and seal duct systems to the Cope Station energy plant, which was originally established in 1996.

Cartee-Berry’s innovative process featured the use of SDS/2’s weld plate box material file type for the creation of the small rectangular duct layout.

The bypass duct ranged in size from 13 feet by 25 feet to 13 feet by 36 feet. The seal duct varied in size from 4 feet by 2 feet to 4 feet by 4 feet.

Fulton State Hospital in Fulton, Missouri

With the existing Fulton State Hospital in Fulton, Missouri, in disrepair, the State of Missouri constructed a new, state-of-the-art mental hospital to replace the aging structure originally built in 1851.

The $211-million, 423,000-square-foot hospital — which opened in 2019 — includes six living units and an administration building.

DGS Technical Services of Elgin, Illinois, detailed the 1,800-ton structure, which included members in dual slope (both slope and skew) in the winged living units. Connections proved critical due to the slope and skew bearing on CMU walls.

TSF Structures: Fabricator Cuts Detailing Time by over 60%

The Problem

Steel detailers spend a great deal of time cleaning up drawings that do not match specific detailing and fabrication standards out of the box. This leads to decreased efficiency and increased cost for detailing a project.

The Solution

SDS/2's detailing templates customization service creates customized files specific to individual standards. These templates are used to help intelligently automate the generation of detail drawings. 

SDS/2: Reduce Costs During Design

SDS/2 has a savings with each connection, but shows its strength when that saving is applied to all connections throughout a project. Based on this study, a typical structure utilizing SDS/2 connection design on 10,000 members has an average savings of 13 minutes per connection, resulting in an estimated savings of $433,333. 

Techflow Engineers: Meeting Fabricators' Expectations

"Everything was accurately detailed using SDS/2 software, allowing the team to meet the Fabricator’s expectations and the owner’s aggressive timeline."

Project by Techflow Engineers: Redstone Gateway is a 470-acre multiuse office park development in Huntsville, Alabama. Techflow created around 1,470 shop drawings and over 160 quality erection drawings for this project. Techflow was awarded ‘building 100’ for steel detailing.

New Jersey Iron: SDS/2 Is the Heart of Our Operation

New Jersey Iron is a 4th generation owned family business with 5th generation now here.  My brother and I are each over the 30-year mark in the business, having started in high school as summer jobs and each could run the first CNC punchline we installed in 1990.  We do projects as large as 1,100 tons, but medium projects are mostly what we do so our tonnage comes in around 3,500 tons a year.  We have (4) SDS/2 stations for detailing, fabrication is all done with CNC equipment, including stairs and rails.  We also do our own shipping, erection, shear stud install, and small crane work (rent

SDS/2 Detailing Templates
Learn how SDS/2 customer, Briese Iron Works, has implemented their customized SDS/2 detailing templates to save time and money on project costs.
Connection Optimization
A commonly overlooked area when seeking to reduce fabrication costs, the number of bolts used throughout a structure can present ample opportunity to eliminate expenses and associated labor.